Preparing a one-mile farm lane in Alford
The farm lane was approximately one mile long. The farmer had widened the road, and the widened section was uneven and in poor condition. We levelled the area and laid recycled asphalt road planings along a strip approximately 1.2 metres wide, extending along the length of the lane.
Combi-unit application set to 1.2 metres
We adjusted our specialist combi unit to an exact 1.2-metre application width to match the prepared strip. The hot tar and chip treatment sealed the new road planings and formed a neat edge joint with the existing tarmac surface.
First layer of hot bitumen and premium granite chippings
This video shows the first layer being applied. The close-up shows the hot bitumen coverage and premium granite roadstone chippings being laid as the combi unit moves along the farm lane. This is work in progress, before the completed surface-dressing finish.
Hot tar and chip surface dressing · Farm lanes and agricultural access roads