UK ROADWORKS GROUP
Cowden House, Comrie: tar and chip surface dressing
Watch our combi unit and roller at work on this two-coat surface dressing project.
COWDEN HOUSE · COMRIE · PERTHSHIRE
Tar and chip surface dressing at Cowden House
At Cowden House in Comrie, Perthshire, we repaired the existing damaged surface, levelled and regulated the road, and filled all holes and dips. We then power-rolled and compacted the prepared surface before machine-laying two coats of tar and chip surface dressing.
Two videos of the work in progress. Select play to watch; sound starts muted.
Tar and chip application at Cowden House
A 30-second view of the combi unit approaching and passing the camera at Cowden House, Comrie, followed by the rear equipment applying the bitumen and chippings.
Power rolling the surface dressing
A closer view of the roller compacting the freshly applied chippings beside the combi unit at Cowden House, Comrie.
Planning similar work in Comrie or Perthshire?
Send us your postcode, photographs and approximate measurements for a free quotation.
Get a free quote









