Recycled asphalt preparation & hot tar and chip
Dumbarton – Recycled Asphalt Base & Two-Coat Surface Dressing
1 photo · Completed project
AfterDumbarton approach finished with two-coat granite surface dressing over power-rolled recycled asphalt planings, following excavation and waste removal.
UK Roadworks Group transformed a large existing gravel area in Dumbarton into a defined, stone-finished approach. The old surface was scraped out and excavated, with all waste removed from site. Recycled asphalt planings were laid, power rolled and compacted to form the prepared base. We then machine applied two coats of hot polymer latex-modified bitumen with granite surface-dressing stone. The completed grey finish follows the curved approach towards the property, combining a reconstructed base with a bitumen-bonded aggregate surface.
Considering a similar project in Dumbarton? Ask us for a quotation.
After
View project album
Get a free quote














