UK ROADWORKS GROUP
Dunfermline – Road Junction Planing & Hot Tarmac Repairs
A roadway junction in Dunfermline was repaired by planing out approximately 60 mm of existing surfacing and replacing it with hot tarmac. Colbond 50 bonding emulsion was included in the preparation between the existing surface and new asphalt. The photograph records the worn and previously patched junction approach before the resurfacing work.
Select any photograph to view it in full.
Before
The work carried out
Remove approximately 60 mm of surfacing
The junction repair involved planing out approximately 60 mm of the existing asphalt. The removal depth was part of this project’s repair specification.
Prepare with Colbond 50
Colbond 50 bitumen-emulsion bond coat was applied as part of the preparation, helping the replacement asphalt bond to the prepared surface.
Lay the replacement hot tarmac
Hot tarmac replaced the removed surface. At a junction, a new enquiry should identify the turning movements, adjoining levels, drainage and any access that needs to remain available.
Road planing and quotations in Dunfermline
For Dunfermline enquiries, call 0330 223 8350.
Planning a project in Dunfermline?
We welcome junction planing & hot tarmac repairs enquiries in Dunfermline. Send your postcode, photographs and approximate measurements to discuss a similar finish for your property.



