UK ROADWORKS GROUP
Grangemouth – Factory & Warehouse Tarmac Repair
A failed area at a factory and warehouse in Grangemouth was repaired after rutting from truck traffic. The damaged section was cut out and squared off, all waste was removed, and heavy-duty SMA-style tarmac was laid.
Select any photograph to view it in full.
After
The work carried out
Cut out the damaged section
The failed area affected by truck tyre rutting was cut out and squared off.
Remove all waste
The removed surfacing material and waste were cleared from the site.
Lay heavy-duty SMA-style tarmac
The prepared section was resurfaced with heavy-duty SMA-style tarmac.
Planning a similar project?
Send us your location, photographs and approximate measurements to discuss your driveway or surfacing work.



