St Fillans – Highway Planing & Hot Tarmacadam Resurfacing
Public highway work in St Fillans combined removal of the existing asphalt with sweeping, bonding tack coat and replacement hot tarmacadam. The photograph shows planing in progress along the carriageway, with the removed strip clearly visible beside the retained surface. The work followed the sequence of removal, preparation, bonding and resurfacing.
Select any photograph to view it in full.
During the work
The work carried out
Plane out the agreed carriageway area
The existing highway surface was planed out to prepare the agreed section for resurfacing. The photograph captures the removal stage along the roadside wall.
Sweep and apply a bonding tack coat
The planed area was swept and a bonding tack coat applied before the new asphalt. Cleaning and bonding form separate parts of the preparation.
Resurface with hot tarmacadam
Hot tarmacadam was laid over the prepared area. For a similar highway scheme, the client specification, work boundaries, access and traffic-management arrangements are agreed before mobilisation.
Road planing and quotations in St Fillans